For Sofregaz in Fos-sur-Mer (13), Bossard developed and manufactured 5 control system units and carried out PLC and terminal operator programming.
CONTEXT
Construction of the new LNG terminal in Fos-sur-Mer comprising of tank soles temperature control (3 tanks 40 m in diameter : 110 000 m3 each) and liquefied natural gas stored at -160°C.
IMPLEMENTATIONS
- Design and manufacturing of 5 control system units :
– Pressurised cabinets for explosive areas and seismic resistance
– PLC
– Controllers - PLC and operator interface programming
- FAT documentation (OQ / PQ).